How to Bounce Back from the Chinese New Year Production Slowdown

January 16, 2020

 by David Collins III

Chinese New Year Red Lanterns Decoration

Chinese New Year (CNY), the most disruptive event in China, officially begins on January 25th, 2020. The rush, and subsequent slowdown, often occurs much earlier depending on the manufacturing facility.

Most businesses come to a standstill for the holidays as a flood of workers return to their home villages to be with their families. In 2020, CNN reported that the country's authorities expected the nation to make around 3 billion trips this year, of which 2.43 billion will be via road, 440 million by rail, 79 million by air, and 45 million by sea during Chunyun (春运) — the world's largest annual human travel season. 

And after the holidays, many workers stay home and don't return to their factories. General managers are left scrambling to find and train replacements. So even if the holiday itself is only 3 weeks long, companies can take nearly 2 whole months to return to pre-holiday production levels!

But it doesn't have to be this way. If a factory plans its operations correctly and makes changes before and during CNY, it can quickly regain full production and be a stronger, leaner manufacturing machine.  

 

How can you recover from the Chinese New Year factory shutdown period?

Spring Festival Chunyun Travelers

 

Though simple, the following actions can go a long way to reducing disruption and improving productivity when your team returns to work in the New Year:

1. Standardized Instructions for Going Back to Work

Standardized instructions provide a reference that operators can use throughout their training and beyond. It develops uniformity among individual workers, and makes it easier to judge performance and troubleshoot problems.

The easiest way to train new workers and refresh the memories of returning ones is to ensure they have clearly defined roles and responsibilities. With expectations clearly documented for reference, they'll know exactly what's required of them and how to do their specific job. 

To create standard instructions, supervisors and experienced operators should provide most of the information. The entire production process must be broken into component operations and communicated both simply and concisely enough for all workers to understand and share.

 

2. Write Checklists for Equipment Shutdown and Startup

On the surface, this may not seem necessary. Just press the off switch or unplug it, right? But improperly handling production machinery can waste days or even weeks of production time.

To put the potential losses in perspective: A case study published in the International Journal of Production Economics showed that if a Swedish paper-mill avoided unplanned stoppages and bad quality productions with better maintenance policies, a paper-mill machine could generate an extra profit of almost US$1 million dollars.

Ideally, each workstation should have specific instructions for turning off machines, storing their components, and maintaining them. This will reduce your machinery's potential for failure so when you need to start them up again, they're more likely to work without delay.

Consider adding information on removing and storing sensitive pieces of equipment, filling up or removing lubricants and oils, and/or shutting off the power in a predetermined sequence. Failure to do so can damage sensitive pieces and cost you thousands of RMB to fix and replace.


3. Reorganize Your Manufacturing Process and Resource Allocation

Reorganize the Factory Floor 

Initially, the post-CNY turnover may seem daunting. But rather than dragging your company down, see this as a golden opportunity to reshuffle.

Chinese factories are typically over-staffed and so poorly organized that many operators are either doing unnecessary and unprofitable tasks (e.g. physically carrying work-in-progress to new stations rather than moving them on a line), or spending time waiting to do their job.

Understanding these inefficiencies and reorganizing the line accordingly will reduce wasted time and effort, lower manpower requirements, and speed up overall production. Undergoing this sort of streamlining means you'll only need to hire less staff as opposed to replacing all those who left during the holidays. 

To Conclude

We hope these simple, yet effective, tips were instructive. These are just a sample of the operations a factory can perform to prepare itself for CNY. Your situation is obviously unique, but the pains that factory management, owners & buyers share often have very similar root causes.

 


Want to know if your factory is performing well? Click below.

22 Signs Of Good Factory Management in China eBook

Topics: Lean Manufacturing, Manufacturing Consulting, Process Improvement

David Collins III

David Collins III

David was a Senior Strategy Consultant for Deloitte, served in Iraq as a Special Operations Civil Affairs soldier, and as a Governance Advisor to the Afghan Government with the Department of State. At MTG, David advises clients on strategy and investments.

Subscribe to receive MTG tips & resources

Related articles

Understanding and Managing Capacity Constraints

David Collins III

Read More

Navigating Protective Tariffs: What Manufacturers Need to Know

David Collins III

Read More

AI in Manufacturing: Are Manufacturing Consultants Still Needed?

David Collins III

Read More